Archive:

engineering works/projects
// 21 November 2017
The current line will be shifted by about 40m and will pass through the structure under construction, visible in the background.

One of the most frequented sections of the Luxembourg rail network is located between Luxembourg and Bettembourg. To relieve this particularly busy route, a new, double-track section is being built since 2015, connecting Luxembourg and Bettemburg directly and running alongside the A3 / E25 motorway. This new section, with a length of 7 kilometers and…

More
engineering works/projects
// 20 November 2017
The new display offers 21 square meters, entirely dedicated to customer information inside Luxembourg main station

During their walk through Luxembourg main station, many travelers already had the opportunity to discover the brand new display. Several weeks ago, coworkers of CFL and Funkwerk started with the disassembly of the older panel and the installation of the brand new eye-catcher. The technology behind the two panels couldn’t be more different. The considerably…

More
engineering works/projects
// 7 November 2017
The second “Pulvermühle” viaduct will be operational in 2019.

The Luxembourgish rail network is constantly in motion: Every day, around 1,000 trains run on the network, carrying passengers and goods. All lines of the entire Grand Duchy converge in the Luxembourg train station, the central hub of the railway network. Over the past few years, the number of customers using the services offered by…

More